
It’s been a while since we've done a random thoughts thread, so I thought I would take advantage of some stuff I've been tweeting about the last few days and get another one out. I almost forgot this series existed, mainly because we only ever do it on rare ocassions. It isn't standardized or anything.
Anywho, I wasnt planning to talk on most of these things anyways, and again I already had over on twitter. Im still in the midst of travel as well, so my capacity is a bit limited, but since I already put stuff on the other site? I might as well be fair and give love to all of you too.
Anywho…
A note about the Fighter Review
On the fighter review, I think it bears mentioning that we don’t know what exactly the end product will be. The idea it comes out with we’re buying this amount of F-35s and this amount of Gripens isn’t based off anything. It could just as easily give a much simpler answer.
This is also why you won’t see platforms discussed much in official RCAF documents. Officially, it isn’t an F-35 versus Gripen fight. There has been no one saying that. It has always been reviewing the purchase and engaging with suppliers on other options.
We don’t know what the final report will look like. That is up to the Prime Minister to decide at the end of the day. It could have firm commitments, it could only recommend another aircraft be chosen. Right now there is one accepted alternative, so it could go really fast...
But that doesn’t mean that we go and start planning and writing on the expected outcome when the Federal government themselves haven’t committed anything, aren’t discussing individual platforms officially in relation to the review, and there is no contract.
It’s also why I try to push back when, as we saw yesterday, platforms are unmentioned in official reporting as some sort of secret sign from folks. You won’t see it mentioned. You won’t see Gripen plastered around because, officially, it isn’t a factor in the conversation.
One, I find, has to be careful to not read into things too far sometimes, especially when it comes from internal reports, which, speaking of...
Unofficial reports are not endorsements
To speak briefly on yesterday’s report, as some of you have asked if I would do a dedicated post on it, those sorts of internal assessments and studies are fairly common and should be treated with the caveat that they are not official plans and should not be treated as such.
Treating it as this is what the RCAF wants in any of these kinds of assessments is a very common but fundamental error that many in the public space make. In this case, the assessment itself isn’t even coming from the fighter side of things, but the CCA boys.
These sorts of reports are a dime a dozen. They are internal thought exercises designed to look into hypothetical force development pathways that COULD be executed on. They are not projects nor policy, and while they do serve to present ideas and potential avenues, treating them as a high-level position is how many things get misinterpreted and cloud the information space.
It’s also why we usually skip when these things come up, because truthfully they just ain’t that big a deal. Even the plan itself of F-35+CCA+GCAP has been a concept for over a year, hell, it’s what we’re working towards now!
Since I don’t think I’ve fully compiled it…
Things likeliest to get cut from CDC:
A care about ice-strengthening (note: the Navy never asked for a Polar Class specifically, only asking the vessel be equivalent to a PC 6)
Focusing on above 110m designs
The 7000nm range desire is also proving annoying for many.
There’s other things I think the navy is willing to compromise on, such as allowing more commercial systems and practices to be utilized, primarily when it comes to survivability (if it’s hit, it’s gone no matter what mentality) and on the sensor suite. The sensor suite especially is an area that is generally easier to cut for many and presents an immediate cost saving.
There is a greater desire for flexibility and modularity over the best combat suite available anyways. That might mean compromising on other things like strike-length Mk 41 and the number of cells, which we could also see a compromise on when all is said and done.
I also wouldn’t be surprised to see some opening to a foreign design. There are a few yards interested in licensing a foreign design, which has always been a very noble desire, but not one I see the navy fighting hard for if push came to shove.
This is also the primary opening a lot of folks would have to the MEKO A-100, which a lot of folks seem to really love the concept and design of, even if some would argue its flexibility perspective is a bit limited. The Tamandaré-class and Benito Juárez have lots of fans out there who look to them as inspiration.
Korean designs mostly push past 110m, which MIGHT make it through. I don’t expect the navy to exclude 120m designs, but I think they will have a very hard time competing in a tighter environment.
The winning factor for Korean vessels is cost, which helps in some cases when licensing, but not really? Korean designs also tend to be more indigenous than others available, and so you oftentimes deal with the integration factor. That benefits designs that have some alignment to our requirements and desired subsystems.
Should also note this isn’t gossip, just me guessing if the navy is asked to scale. I was thinking last week on what kinda stuff would be cut first.



My god, a voice of sanity regarding the F-35 discussion paper. But I fear people don’t want to be rational about these things.